1. Prodott Aktarview
The GEYA GRT6-B2 is an electronic delay off time relay designed for industrial and domestic applications. It features adjustable delay settings and is suitable for DIN rail mounting. This manual provides essential information for safe installation, operation, and maintenance.
Karatteristiċi ewlenin:
- Dewmien Aġġustabbli: Delay can be set directly via panel knobs for convenience and intuitive control.
- Modi ta' Funzjoni: Supports two primary functions: Delay ON (A) and Delay OFF (B). The GRT6-B2 model features 2SPDT (2NO2NC) contacts.
- Medda ta' Ħin Wiesgħa: Time scale from 0.1 seconds to 10 days, divided into 10 selectable ranges.
- Indikazzjoni ta' l-Istatus: Equipped with LED indicators for power (green light) and working status (red light).
- Disinn kompatt: Ultra-small size, only 18mm width, designed for 35mm DIN rail mounting.

2. Informazzjoni dwar is-Sigurtà
Please read this manual carefully before installation and operation. Failure to follow these instructions may result in equipment damage, injury, or death. This device should only be installed and serviced by qualified personnel.
- Always disconnect power before installing, wiring, or performing maintenance on the device.
- Kun żgur li l-wajers kollha jikkonformaw mal-kodiċijiet elettriċi lokali u nazzjonali.
- Tħaddimx l-apparat jekk ikun bil-ħsara jew ma jkunx qed jaħdem sew.
- Ipproteġi l-apparat mill-umdità, mit-trab, u minn temperaturi estremi.
- Ivverifika l-vol korretttage and current ratings before connecting to a power source.
3. Product Dimensions and Components
The GRT6-B2 relay is designed for compact installation on a DIN rail. Understanding its dimensions and component layout is crucial for proper integration into your system.


4. Installazzjoni u Wiring
The GEYA GRT6-B2 relay is designed for easy installation on a 35mm DIN rail. Follow these steps for secure mounting and correct electrical connections.
4.1 Immuntar tal-Ferrovija DIN
The relay snaps onto a standard 35mm DIN rail. Ensure it is securely fastened to prevent movement during operation.
4.2 Wiring Elettriku
Refer to the wiring diagrams below for proper connection of the power supply and load. Always ensure power is disconnected before wiring.

4.3 Power Connection Demonstration
Watch this video for a visual guide on connecting power and load to the GRT6-B1 model, which shares similar wiring principles with the GRT6-B2.
5. Istruzzjonijiet Operattivi
The GRT6-B2 relay offers adjustable delay functions. Follow these steps to configure and operate your device.
5.1 Function Modes
The GRT6-B2 supports two main function modes:
- A: Delay ON: The output contacts close after a set delay time once power is applied.
- B: Delay OFF: The output contacts open after a set delay time once the trigger signal is removed or power is disconnected.

5.2 L-issettjar tal-ħin
The delay time is set using two rotary knobs on the front panel: one for time range and one for percentage.

5.3 Indikaturi LED
- LED aħdar: Jindika l-istatus tal-provvista tal-enerġija.
- LED aħmar: Indicates the working status of the relay (e.g., timing in progress, output active).
6. Manutenzjoni
The GEYA GRT6-B2 time relay is designed for reliable operation with minimal maintenance. However, periodic checks can help ensure its longevity and proper function.
- Tindif: Żomm l-apparat nadif u ħieles mit-trab u l-fdalijiet. Uża drapp niexef u artab għat-tindif. Tużax prodotti tat-tindif likwidi.
- Spezzjoni: Periodically inspect wiring connections to ensure they are secure and free from corrosion. Check for any signs of physical damage or overheating.
- Ambjent: Kun żgur li l-ambjent operattiv jibqa' fil-firxiet speċifikati tat-temperatura u l-umdità biex tevita ħsara prematura.
7 Issolvi l-problemi
If the GEYA GRT6-B2 relay is not functioning as expected, consider the following common issues:
- No Power Indication (Green LED Off): Check the power supply connections (A1, A2) and ensure the voltage is within the specified range (AC/DC 24V-240V).
- Relay Not Activating/Deactivating:
- Verify the function mode (A or B) is correctly selected.
- Check the time range and percentage settings.
- Ensure the trigger signal (S) is correctly applied for Delay OFF functions.
- Inspect load connections and ensure the load is functioning correctly.
- Ħin żbaljat: Re-check the time range and percentage settings. Ensure the knobs are firmly set to the desired values.
- Is-sħana żejda: If the device feels excessively hot, check the load current to ensure it does not exceed the relay's maximum rating (10A/AC1).
If problems persist after checking these points, contact a qualified electrician or the manufacturer for assistance.
8. Speċifikazzjonijiet
Detailed technical specifications for the GEYA GRT6-B2 time relay.

| Parametru | Valur |
|---|---|
| Brand | GEYA |
| Mudell | GRT6-B2 |
| Funzjoni | Delay ON (A), Delay OFF (B) |
| Terminali tal-Provvista | A1-A2 |
| Voltage Firxa | AC/DC 24V-240V (50-60Hz) |
| Input tal-Enerġija | AC max. 6VA/1.9W |
| Firxiet ta' Ħin | 0.1s - 10 days (ON, OFF) |
| L-issettjar tal-ħin | Potenzjometru |
| Output | 2xSPDT (2NO2NC) |
| Klassifikazzjoni kurrenti | 10A/AC1 |
| Qlib Voltage | 250VAC/24VDC |
| Temperatura operattiva | -20°C sa +55°C (-4°F sa 131°F) |
| Temperatura tal-Ħażna | -35°C sa +75°C (-22°F sa 158°F) |
| Immuntar | DIN rail EN/IEC 60715 |
| Dimensjonijiet (L x W x H) | 64mm x 18mm x 95mm (madwar) |
| Piż | Appross. 2.08 uqija |
9. Garanzija u Appoġġ
For warranty information, please refer to the documentation provided with your purchase or contact your seller. If you require technical support or have questions regarding the GEYA GRT6-B2 time relay, please reach out to the manufacturer or authorized distributor.





