Aoodor A200-PAMTT-UKWL0

Aoodor 6 x 10 Ft Walk-in Greenhouse Instruction Manual

Model: A200-PAMTT-UKWL0

Informazzjoni Importanti dwar is-Sigurtà

Twissija: This greenhouse contains sharp edges on the aluminum frame and polycarbonate panels. Always use caution when handling and assembling the greenhouse to avoid injury. The greenhouse is heavy and may require multiple people for assembly and anchoring. Prolonged exposure to sunlight may cause UV damage to plants and users. Always wear appropriate protective clothing and eyewear when working in or around the greenhouse.

Prodott Overview

The Aoodor 6 x 10 Ft Walk-in Greenhouse (Model A200-PAMTT-UKWL0) is designed to provide an optimal environment for plant growth. It features a heavy-duty aluminum frame and polycarbonate panels, offering durability and efficient thermal insulation.

Karatteristiċi ewlenin:

Kontenut tal-Pakkett

Before beginning assembly, ensure all parts and fasteners are present and accounted for. Refer to the detailed parts list in your manual. Components are typically labeled with piece numbers for easy identification.

Video: Greenhouse Installation Tutorial. Dan il-video jipprovdi ħarsa komprensivaview of the assembly process, including identifying all parts and fasteners.

Istruzzjonijiet ta' Twaqqif u Assemblaġġ

Follow these steps carefully for proper assembly. It is recommended to have at least two people for certain stages of construction. Refer to the 'Greenhouse Installation Tutorial' video for visual guidance on each step.

Step 1: Assemble the Foundation

  1. Unpack all components and lay them out, identifying each piece by its number.
  2. Connect foundation pieces (e.g., Piece 1 and Piece 2) using the designated fasteners (e.g., Fastener 42). Ensure the door wheel trough is correctly oriented.
Aoodor 6x10 Ft Greenhouse in a snowy backyard

Image: Aoodor 6x10 Ft Greenhouse. The assembled greenhouse in a snowy environment, showcasing its structure.

Step 2: Construct the Back Wall

  1. Attach the vertical support pieces (e.g., 5A and 5B) to the foundation corners.
  2. Install the middle vertical supports (e.g., 14 and 15) using appropriate fasteners (e.g., 42B).
  3. Secure the diagonal braces (e.g., 29) to the vertical supports and foundation using fasteners (e.g., 41).
  4. Slide the polycarbonate panels (e.g., C panels) into the frame grooves and secure them with the top horizontal pieces (e.g., 20) and fasteners (e.g., 42B).
  5. Install the triangular top panels (e.g., E and F) for the back wall.
Diagram showing product dimensions of the Aoodor 6x10 Ft Greenhouse

Immaġni: Dimensjonijiet tal-Prodott. A diagram illustrating the overall dimensions of the greenhouse, including height, width, and length.

Step 3: Construct the Front Wall

  1. Repeat the process from Step 2 for the front wall, ensuring the door frame is correctly positioned.
  2. Assemble the top frame pieces (e.g., 10, 11, 34, 33A/B) using fasteners (e.g., 42) and attach them to the front wall.

Step 4: Assemble the Side Walls

  1. Combine side wall channel pieces (e.g., 6 and 7) to create longer sections.
  2. Install these side wall channels to connect the front and back walls.
  3. Slide the polycarbonate panels (e.g., A panels) into the side wall frame grooves. Ensure the positioning hole on the upper side of the vertical supports (e.g., 16) is correctly oriented to connect the diagonal braces (e.g., 29).
Close-up of the greenhouse frame components, highlighting aluminum alloy, cross-beam support, and galvanized steel base

Image: High Quality Frame. Dettaljati view of the aluminum alloy frame, stronger cross-beam support, and galvanized steel base, emphasizing structural integrity.

Step 5: Install the Roof Panels and Skylights

  1. Assemble the top window frame (e.g., 23A, 23B) using fasteners (e.g., 42A).
  2. Slide the window panel (e.g., 30) into the assembled frame.
  3. Attach the center piece for the window (e.g., 34) to the roof structure.
  4. Slide the main roof polycarbonate panels (e.g., B panels) into place and secure them with the horizontal pieces (e.g., 17).
  5. Install the remaining roof support pieces (e.g., 18A, 18B, 22) to frame the skylight opening.
Close-up details of the Aoodor greenhouse, including adjustable skylight, drainage outlet, lockable door, and double-sided door

Image: Details. Close-up views of the adjustable skylight, drainage outlet, lockable door, and double-sided door features.

Step 6: Install the Gutter System and Door

  1. Attach the side piece, which also functions as the gutter, to the roof edge.
  2. Assemble the door frame (e.g., 25, 27A/B, 28) and insert the polycarbonate panels (e.g., G panels).
  3. Install the door by sliding its wheels into the designated track at the base of the greenhouse.
  4. Attach the door stopper (e.g., 36) to prevent the door from coming off the track.
  5. Install the ground hooks (stakes) to secure the greenhouse against wind.

Video: Greenhouse Installation Tutorial. This video demonstrates the complete assembly process from unboxing to final securing.

Istruzzjonijiet Operattivi

Operazzjoni tal-Bieb

Skylight Adjustment

Aoodor greenhouse with open skylight and door, showing interior space

Image: Open Skylight and Door. The greenhouse with its skylight open for ventilation and the door ajar, revealing the spacious interior.

Manutenzjoni

Regular maintenance ensures the longevity and optimal performance of your greenhouse.

Gutter System

Pannelli tal-Polikarbonat

Qafas tal-aluminju

Issolvi l-problemi

Panels Coming Loose

Excessive Heat Accumulation

Drenaġġ ħażin

Speċifikazzjonijiet

KaratteristikaDettall
Dimensjonijiet tal-Prodott120"T x 72"W x 81"Għ (71.65 x 80.71 x 120.08 pulzieri)
Piż tal-oġġett34.9 liri
Materjal tal-qafasAluminju
Materjal tal-GħattiPolikarbonat (PC)
KulurFidda
Numru ta' Ventijiet1 (Tieqa tas-saqaf aġġustabbli)
Numru tal-Mudell tal-OġġettA200-PAMTT-UKWL0

Garanzija u Appoġġ

For warranty information, technical support, or to order replacement parts, please contact Aoodor customer service. Refer to your purchase documentation for specific contact details and warranty terms.

Dokumenti Relatati - A200-PAMTT-UKWL0

Preview Gwida għall-Assemblaġġ u l-Installazzjoni tas-Serra Aoodor - SKU A537
Gwida pass pass għall-assemblaġġ u l-installazzjoni tas-Serra Aoodor, SKU A537. Tinkludi lista tal-partijiet u struzzjonijiet tal-assemblaġġ għal serra b'4 livelli.
Preview Gwida għall-Installazzjoni u Manwal tal-Immuntar tal-Purtieri Aoodor
Gwida komprensiva għall-assemblaġġ u l-installazzjoni għall-kits tal-purtieri Aoodor, li tinkludi l-identifikazzjoni tal-partijiet, id-dimensjonijiet għall-mudelli A029, A030, A031, A032, u A251, u struzzjonijiet pass pass. Tinkludi informazzjoni ta' kuntatt għall-appoġġ.
Preview Gwida għall-Assemblaġġ u l-Installazzjoni tas-Sodda tal-Ġnien AOODOR - Mudell A016
Gwida komprensiva għall-assemblaġġ u l-installazzjoni tas-Sodda tal-Ġnien AOODOR, Mudell A016. Tinkludi l-identifikazzjoni tal-partijiet, struzzjonijiet pass pass, u informazzjoni ta' kuntatt għall-appoġġ.
Preview Gwida għall-Assemblaġġ u l-Installazzjoni tal-Gazebo tal-Injam AOODOR (SKU: A422)
Manwal dettaljat tal-assemblaġġ u l-installazzjoni għall-Gazebo AOODOR Wooden Grill (SKU: A422). Din il-gwida tipprovdi lista komprensiva tal-partijiet u struzzjonijiet pass pass għall-bini tal-gazebo tiegħek.
Preview SKU:A013 Gwida għall-Assemblaġġ u l-Installazzjoni tas-Sodda tal-Ġnien ta' Aoodor
Din il-gwida tipprovdi struzzjonijiet dwar l-immuntar u l-installazzjoni għas-Sodda tal-Ġnien Aoodor SKU:A013. Tinkludi lista tal-partijiet, passi tal-immuntar, u informazzjoni ta' kuntatt għall-appoġġ għall-klijenti.
Preview Gwida għall-Installazzjoni ta' Sodda tal-Ġnien Imqajma AOODOR - Manwal tal-Assemblaġġ tal-Mudell A017
Istruzzjonijiet tal-assemblaġġ pass pass u lista tal-partijiet għas-Sodda tal-Ġnien Imqajma AOODOR, mudell A017. Tgħallem kif tinstalla malajr is-sodda tal-ġnien il-ġdida tiegħek.