BFT P125002

Manwal tal-Istruzzjonijiet tal-Kit ta' Backup tal-Batterija BFT SB-BAT P125002 24V DC

For BFT Gate Opener Systems

1. Introduzzjoni

This manual provides essential instructions for the installation, operation, and maintenance of the BFT SB-BAT P125002 24V DC Battery Backup Kit. This kit is designed to ensure continuous operation of compatible BFT gate openers during temporary power outages. Please read this manual thoroughly before proceeding with installation or use.

2. Prodott Aktarview

The BFT SB-BAT P125002 is a 24V DC battery backup system that integrates with specific BFT gate operators. It includes a smart charger board that manages battery charging when main power is available and automatically switches to battery power when the main supply is interrupted.

BFT SB-BAT P125002 Battery Backup Kit components in box

Figura 1: Aktarview of the BFT SB-BAT P125002 Battery Backup Kit, showing the product box, two batteries, wiring, and mounting hardware.

2.1. Komponenti tal-Kit

Individual components of the BFT SB-BAT P125002 Battery Backup Kit

Figura 2: Dettaljat view of the BFT SB-BAT P125002 kit components, including batteries, wiring, mounting brackets, and the battery holder.

3. Kompatibilità

This battery backup system is compatible with the following BFT gate operator series:

Ensure your gate operator model is listed above for proper functionality.

4. Setup u Installazzjoni

Installation of the BFT SB-BAT P125002 kit is designed to be straightforward. However, it is recommended that installation be performed by a qualified technician to ensure safety and correct operation. Always disconnect main power to the gate operator before beginning installation.

4.1. Prekawzjonijiet tas-Sigurtà

4.2. Passi ta' Installazzjoni (Linji Gwida Ġenerali)

  1. Mount the Battery Holder: Secure the battery holder/mounting base within the gate operator's control box or an appropriate enclosure using the provided mounting brackets and fasteners. Ensure it is stable and accessible.
  2. Daħħal Batteriji: Place the two 12V 1.2Ah batteries into the battery holder.
  3. Qabbad il-batteriji: Connect the batteries in series to achieve 24V DC, following the wiring diagram provided with your specific gate operator or the kit's smart charger board. Ensure correct polarity.
  4. Connect Smart Charger Board: Integrate the smart charger board into the gate operator's control unit. Refer to your gate operator's manual for the specific connection points for the battery backup system.
  5. Wiring Sikur: Route and secure all wiring to prevent pinching or damage.
  6. Irrestawra l-Enerġija: Once all connections are verified and secure, restore main power to the gate operator. The smart charger board will begin charging the batteries.
  7. Sistema tat-Test: Perform a power outage simulation to verify the battery backup system activates correctly and powers the gate operator.

5. Istruzzjonijiet Operattivi

The BFT SB-BAT P125002 operates automatically once installed correctly.

5.1. Normal Operation (Power On)

When main power is supplied to the gate operator, the smart charger board within the SB-BAT kit continuously monitors the battery charge level. It will charge the batteries as needed to maintain them at full capacity.

5.2. Qawwa Outage Operation (Power Off)

Fil-każ ta' qawwa outage, the smart charger board automatically detects the loss of main power and switches the gate operator to battery power. The gate operator will then function normally using the stored energy in the batteries. The duration of operation on battery power depends on the frequency of gate usage and the charge level of the batteries.

6. Manutenzjoni

Regular maintenance ensures the longevity and reliability of your battery backup system.

6.1. Iċċarġjar mill-ġdid tal-batterija

Wara qawwa outage, once main power is restored, the smart charger board will automatically begin recharging the batteries. A full recharge typically takes 12 sa 14 siegħa. It is important to allow sufficient time for batteries to fully recharge after use.

6.2. Fuse Check

Is-sistema tinkludi a Fjus 20A for protection. If the battery backup system fails to operate or charge, inspect the fuse for continuity. Replace with a fuse of the exact same rating if necessary. Always disconnect power before checking or replacing fuses.

6.3. Ħajja tal-Batterija u Sostituzzjoni

Batteries have a finite lifespan. Periodically test the system by simulating a power outage to ensure batteries hold a charge and can power the gate operator. If performance degrades significantly, consider replacing the batteries. Use only recommended replacement batteries (2x 12V 1.2Ah sealed lead-acid).

7 Issolvi l-problemi

If your BFT SB-BAT P125002 battery backup system is not functioning as expected, consider the following:

For persistent issues, contact BFT technical support or a qualified service technician.

8. Speċifikazzjonijiet

KaratteristikaSpeċifikazzjoni
Numru tal-MudellP125002
Tip ta 'batterijaĊomb-Aċidu Issiġillat
Kapaċità tal-batterija2x (12V 1.2Ah)
Ħruġ Voltage24V DC (nominal)
Ħlas Voltage27.2V
Iċċarġjar Kurrent130mA
Ħin tal-Iċċarġjar tal-Batterija12-14 sigħat
Exhausted Battery Protection Threshold20.4V
Fjus Rating20A
Temperatura operattivaData detected with external temperature of: 25°C (77°F)

9. Garanzija u Appoġġ

For warranty information, please refer to the documentation provided with your original purchase or contact BFT customer support directly. For technical assistance, installation queries, or troubleshooting beyond the scope of this manual, please contact your authorized BFT dealer or BFT technical support.

BFT Contact Information: Please visit the official BFT webis-sit għad-dettalji ta' kuntatt u r-riżorsi ta' appoġġ l-aktar aġġornati.

Dokumenti Relatati - P125002

Preview Sistema ta' Awtomazzjoni ta' Bieb Elettromekkanika BFT DEIMOS BT UL/CSA
Skopri l-BFT DEIMOS BT UL/CSA, sistema ta' awtomazzjoni elettromekkanika għal xtiebi li jiżżerżqu b'rack. B'teknoloġija intelliġenti, tħaddim sikur ta' 24V, u installazzjoni simplifikata, din is-sistema ttejjeb is-sigurtà u l-konvenjenza tal-bibien. Esplora l-ispeċifikazzjonijiet tekniċi tagħha u l-aċċessorji disponibbli għal applikazzjonijiet residenzjali u kummerċjali.
Preview Istruzzjonijiet għall-Kodifikazzjoni mill-Bogħod tal-BFT Mitto 2M/4M: Gwida Komprensiva
Tgħallem kif tipprogramma l-kontrolli remoti BFT Mitto 2M u 4M tiegħek għal openers ta' garaxxijiet u bibien. Din il-gwida tkopri l-kodifikazzjoni għal riċevituri bi u mingħajr skrins diġitali, inklużi twissijiet importanti ta' sigurtà.
Preview Manwal tal-Installazzjoni tal-Awtomazzjoni tal-Bieb Swing BFT VIRGO
Gwida komprensiva għall-installazzjoni u l-utent għas-sistema ta' awtomazzjoni tal-bieb swing BFT VIRGO, li tkopri s-sigurtà, l-ispeċifikazzjonijiet tekniċi, il-proċeduri ta' installazzjoni, l-ipprogrammar u l-manutenzjoni.
Preview Manuale di Installazione e Użu BFT GIOTTO 30-60 S BT / GIOTTO 30-60 BT
Guida completa per l'installazione e l'utilizzo delle barriere automatiche BFT GIOTTO 30-60 S BT e GIOTTO 30-60 BT. Inkludi speċifikazzjonijiet tekniċi, konfigurazzjoni u manutenzjoni.
Preview Istruzzjonijiet għall-Kodifikazzjoni tar-Remote BFT MITTO 2B | Remotes Retro
Gwida pass pass għall-kodifikazzjoni tar-remotes BFT MITTO 2B għal openers tal-bibien, li tkopri l-metodi eżistenti tal-iskrin LCD tar-remotes u r-riċevituri. Tinkludi pariri dwar is-soluzzjoni tal-problemi.
Preview Gwida għall-Installazzjoni tas-Sistema ta' Kontroll bir-Radju BFT CLONIX1-2 & MITTO 2-4 433MHz
Gwida komprensiva għall-installazzjoni għar-riċevitur BFT CLONIX1-2 u t-trasmettituri tal-kontroll tar-radju MITTO 2-4 433MHz, li tkopri l-ipprogrammar, il-klonazzjoni, is-sigurtà, u l-ispeċifikazzjonijiet tekniċi għall-awtomazzjoni tal-bibien u x-xtiebi.